We proposed analyzing the old site before touching anything, to identify what needed improving and in what order. Each action was prioritized by its impact on the future site, and all the work was coordinated in a Gantt chart shared between both teams, with approval stages before each release to production.
ACTION PLAN
How we approached it
Analysis of the old site
We studied the existing site in depth and used a shared Gantt chart to coordinate both teams' actions. Each improvement was ranked by its impact on the upcoming site.
Improvement opportunities
We presented the proposals to the client's team and, once they signed off, pushed them to production. Nothing went live without prior approval.
Planning and release to production
We laid out precisely what each team was responsible for and went through several approval and execution stages up to the production release, knowing that a migration doesn't forgive improvisation.
Numbers that speak for themselves.
- Non-brand clicks
- 4x
- CTR on non-brand queries
- 3x
- Overall impressions
- +25%
- Overall clicks
- +10%
Migrating without losing ground
A migration is when a site is most exposed: years of rankings can evaporate in a week. Balanz came out the other side with more impressions and clicks than before. In a migration, that isn’t breaking even; it’s winning.